Skip to main content

January 28, 2022, Sienna Resources Inc. (“Sienna” or the “Company”) (SIE—TSX.v, SNNAF—USA, A1XCQ0–Germany) is pleased to announce that the maiden multi-hole drill program on the Blue Clay Lithium Project in Clayton Valley, Nevada is now underway.  This project consists of 94 contiguous claims totaling approximately 1950 acres prospective for lithium right in the heart of the Clayton Valley in Nevada, which is home to the only currently producing lithium region in North America

Jason Gigliotti, President of Sienna Resources, states: “It is very exciting to commence our maiden drill program on the Blue Clay Lithium Project right in the heart of the Clayton Valley, the preeminent address for lithium in North America. It is perfect timing to commence a drill program at a time when lithium demand and prices are at all-time highs.  Nevada has become one of the most sought after lithium addresses in the world, and Sienna is located in multiple locations in this prolific region.   I was physically on the property recently and I am very optimistic about the prospects for this project and expect to have a steady flow of news going forward.”

Clayton Valley, Nevada Lithium Map

About Sienna Resources Inc.

Sienna Resources is focused on exploring for and developing high-grade deposits in politically stable, environmentally responsible and ethical mining jurisdictions. Sienna is partnered with a New York Stock Exchange-listed mining company on two separate projects in Scandinavia including the past-producing Bleka and Vekselmyr orogenic gold projects in southern Norway which are both greenstone-hosted gold systems, and the Kuusamo platinum group elements (PGE) project in Finland directly bordering the LK Project being advanced by Palladium One Mining Inc. In North America, Sienna’s projects include the Marathon North platinum-palladium property in Northern Ontario directly bordering Generation Mining Ltd.’s 7.1-million-ounce palladium-equivalent Marathon deposit. Sienna also has the Clayton Valley Deep Basin Lithium Project in Clayton Valley, Nev., home to the only lithium brine basin in production in North America, in the direct vicinity of Albemarle Corp.’s Silver Peak deposit and Tesla Motors Inc.’s Gigafactory and the recently acquired Blue Clay Lithium Project in Clayton Valley Nevada. Management cautions that past results or discoveries on properties in proximity to Sienna may not necessarily be indicative to the presence of mineralization on the company’s properties.

If you would like to be added to Sienna’s email list, please email [email protected] for information or join our twitter account at @SiennaResources.

Contact Information

Tel:  1.604.646.6900

Fax: 1.604.689.1733

www.siennaresourcesinc.com

[email protected]

“Jason Gigliotti”

President, Director

Sienna Resources Inc.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release.